Monday, January 30, 2012

The Last of the Concrete Footings Poured

 Today, they poured the footings for the steel supports for the wall and roof and located the metal plates in the footings that will anchor the steel support beams. They also took off the wood framing for the footings and have started to backfill dirt next to the footings. Next up this week is the plumber locating the grease trap for the kitchen and the kitchen and bathroom drains.
Backfilling dirt
 Concrete pump truck used to get the concrete where it needed to be poured.


 Insulation on the footings.
Looking down on the area
Measuring to locate the anchor plate for the steel support.

 Positioning the anchor plate in the footing.

 
 Anchor plate in a footing.



Saturday, January 28, 2012

Sunday Focus at Church - January 29 & Building Update

     This Sunday we will celebrate Sanctity of Life Sunday with a baby dedication. What better way to celebrate life  than to have a baby dedication!
     The sermon will hit home to a number of Christians who are living with a nonbelieving spouse. I will talk about how to help you if you are one of many whose spouse does not yet believe. We also will have our talented youth lead our worship music time.
     Building-wise, we were not able to pour concrete yesterday because of the rain. The repour is slated for Monday.
     You might have noticed the ceiling of our lobby taken apart. If you look closely (see a couple of pictures below) you will see that we have covered over what used to be the windows of the old sanctuary. These have been a major source of noise leaking through into the lobby and lounge. We covered them with insulation and sheet rock. I hope those of you who use the lounge will hear less noise now!

You can see the insulation covering this window.
 This old window has sheet rock over the insulation.

Thursday, January 26, 2012

Building Foundations Poured

 The second pour of the foundations.
 Keeping the first pour warm.

 The heating machine to keep the concrete "warm" in the cold weather so it cures.

 Pouring the first concrete for the base of the footings and steel supports.







 Showing the r-bar and getting ready for the second pour.




Today they poured the foundations for the building. Tomorrow will complete the concrete foundation pours. One more pour to go next week for the slabs.

Wednesday, January 18, 2012

Building Update

We have completed the demo of the front entrance and canopy, dug the footings and are ready to pour the concrete tomorrow.